Here are the latest photos. Things are coming along nicely. The electrical is done, the shower is in. The tile heat has been installed minus the floor over it. I need to have a couple inspections this next week and then I will be on to insulating and sheetrock. Check out the photos below.
Tile heating mat for posterity.
View as you enter the bathroom.
Entertainment center wire bundle, this is at the wet bar because this is where we will be installing the receiver.
Finished electrical panel.
Installed shower with drain hooked up.
Stay tuned for more.
Sunday, June 7, 2009
Subscribe to:
Posts (Atom)