Tuesday, May 26, 2009

Basement Updates

Here are the latest basement updates. The fireplace is finished and ready to be inspected. The rough in plumbing is done and ready to be inspected. The electrical is almost done and ready for rough in inspection.

Finished fireplace with hearth.

Finished moving bathroom vanity drain and centering shower drain.

The other direction.

Completed wet bar soffit to accommodate heating vent.

Completed wet bar drain and vent connection.

Wet bar vent from utility room, it was interesting trying to figure out where to connect this into the existing vent.

That's all for now, we're getting there!

Sunday, May 17, 2009

Basement Finishing 2

The past several weeks have kept me busy working on plumbing, framing in the fireplace, having the fireplace and duct work installed, and doing the electrical with my brother Tom's help. We are really liking the way things are coming together. Here is a photo update.


Moving the bathroom vanity drain.


Putting in the wet bar drain.


Framing in the fireplace.


Installed fireplace.


Example of some of the canned lights.


Wet bar cans.


Game area canned lights.


New sub-panel in the utility room.


Bedroom outlets, I have to cut through the poly and take out the fiberglass because each outlet run is needing to come down from the top of the wall.