Tuesday, May 15, 2012

House Building - Week Two

The building continues.  Over the past few days they've poured the footings, poured the walls, and insulated and waterproofed.  Here are some photos to show the progress.

front garage footings

back and side footings

forms for walls

back footings

garage with poured and insulated walls

porch and front poured walls

looking down at front porch footings - about 6 to 8 feet down

garage floor and back walls

back wall to long garage stall

basement walls with drain tile

basement walls

front basement walls

front basement wall with drain tile and sump pump basket

sump pump basket in black, that is in the utility/storage room

basement west wall, that is the long garage stall

back yard

east side yard view

driveway, looking from the west