Today Heather and I ran out to the house to see the progress because they leveled the lot. A number of new things had been completed/installed. Check out the photos.
 |
| There will be drain tile at the low part of the yard and a boulder retaining wall behind the garage for Baylen's kennel to sit on. |
 |
| New sidewalk, I'm glad they put the gutter drain under the sidewalk! |
 |
| New front door, they haven't installed the side windows yet. |
 |
| The pendants, double oven, back splash, faucet, and range hood have all been added. |
 |
| The railings have been stained and installed! |
 |
| Dining room light. |
 |
| The well tank. |
 |
| The furnace, air exchange, water heater, and water softener loop have been installed. |
 |
| Basement surface mount lights plus new railing. |
 |
| New master fan. |
 |
| Laundry room shelf and sink area. |
 |
| They must have needed to access the back of the shower faucet, this is inside the linen closet. Hmm, interesting. |
 |
| Hanging light in the stairs. |
 |
| Railings from upstairs to the main level. |
 |
| They will be painting this weekend, or so I was told. |