Friday, August 17, 2012

House Building - Week Fourteen

Today Heather and I ran out to the house to see the progress because they leveled the lot.  A number of new things had been completed/installed.  Check out the photos.





There will be drain tile at the low part of the yard and a boulder retaining wall behind the garage for Baylen's kennel to sit on.


New sidewalk, I'm glad they put the gutter drain under the sidewalk!

New front door, they haven't installed the side windows yet.

The pendants, double oven, back splash, faucet, and range hood have all been added.


The railings have been stained and installed!


Dining room light.

The well tank.

The furnace, air exchange, water heater, and water softener loop have been installed.


Basement surface mount lights plus new railing.


New master fan.


Laundry room shelf and sink area.

They must have needed to access the back of the shower faucet, this is inside the linen closet.  Hmm, interesting.

Hanging light in the stairs.

Railings from upstairs to the main level.



They will be painting this weekend, or so I was told.

No comments: